Xinyue supply marine steel frame project

Project location:Middle East

Product:T-Type Welding & SMLS Pipes

Specifications:OD 273-1219MM, WT 12.7-75MM, L 6000-12000MM

Standard and material:EN10219 EN10225 S355G7/G8+N/MZ35,API 5L X52N PSL2

Usage:Offshore steel structure project

Inquiry time:2022.01.20

Order time:2022.06.05

Shipping time:2022.08.09

Estimated arrival time:2022.08.30

This order is quite difficult for us and our client. The steel grade of steel pipes is high and the quantity is small, the thickest pipe reaching 75mm wall thickness. The customer knew that Xinyue has 40 years of history and experience in the steel industry and was rich in resources, so he specially came to us for help. We found the best inventory plan for the customer at the beginning of receiving the inquiry from the customer, but due to the design change of the end user, the order has not been determined. We have also updated feasible solutions for customers during these times. By the end of May, after the design of the end user was confirmed, the customer directly sent the contract to Xinyue. However, due to four months passed away, the previous inventory has been sold out. In order to help customer complete the project support as soon as possible, we gathered the procurement, planning, production, logistics and other departments to carry out a meeting for detailed resource search and production plan, and set the fastest delivery time of 30 days. The customer was very satisfied and paid a deposit the next day. Now all the pipes have been completed as scheduled and loaded in sailing.

In the production process, we strictly implement each test step. After all the physical, chemical and impact tests of raw steel plates and billets (CNAs laboratory) qualified, then the production of pipes can be arranged. After the completion of the product pipe, the physical, chemical and impact properties of the finished steel pipe were tested. 100% NDT was carried out on the weld area of the T-welded pipe, and all the tests were qualified.

We firmly believe that quality is the best publicity of the enterprise, so for every steel pipe to be delivered to customers, we will ensure 100% qualified. Customer satisfaction is our great driving force; For customer orders, we are try the best. No matter the quantity and difficulty of the customer’s order, we never failed to meet it.

https://www.xysteelpipe.com/xinyue-supply-marine-steel-frame-project/

Supply Duplex Stainless Steel to Middle East

Project location:Middle East

Product:Supper Duplex Stainless Steel Round

Standard and material:ASTM A182 F53/1.4410

Specifications:95*3000;20*3000;120*3000

Usage:Valves parts

Inquiry time:2022, 4.30

Order time: 2022 , 7.7

Shipping time:2022. 8.30

Estimated arrival time:2022.9.30

The order is from the Middle East, and the customer is a local valve production plant. In April 2022, it received the customer’s inquiry for the first time. Xinyue gave full play to its resource integration ability and proposed timely price plans to customers. Because customers do their own processing, the finished products are exported to the United States, Europe and other places.

Compared with other countries, this country has extremely strict requirements on product material and inspection, and requires that PREN should be greater than 40.

In view of this situation, after signing the contract, Xinyue immediately organized various departments to hold a pre-factory meeting to control all details in advance and put forward all the Attention to detail, focused analysis, discussions and solutions.

https://www.xysteelpipe.com/supply-duplex-stainless-steel-to-middle-east/

Xinyue Fully Supports Singapore MRT Project

Project location: Singapore

Product: SSAW steel pipe welded with T + L clutch

Specification: 1800mm x 15meter/18meter

Standard & Grade: EN10219 S355JR

Usage: Metro piling construction

Received the inquiry in June 2021.

Signed the contract on July 21th 2022

Estimated Shipping time: Sep, 2022

It has taken more than one year from the first inquiry to the final order for this project. Due to the single specification and large quantity, the competition has been fierce since the initial quotation. However, this product is the most competitive main product of our group, and we Xinyue has rich experience in welding clutches, we have submitted the customer a very attractive solution since the first bidding.

Besides, the lock of this order is not the common C9 clutch, but the T + L type clutch which needs special welding and customization. The T type part is welded by two steel plates, and the L type part is cut by Angle steel. After repeatedly confirming the design drawing and technical parameters of the clutches, Xinyue issued the final drawing of clutch, and the customer also submitted this drawing to the project end user, and finally obtained the final approval.

Finally, in June this year, after the final consultation between the client and Xinyue, the order for the second phase was confirmed, but due to the long delay of the project, the delivery time was very tight. In order to meet the customer’s delivery date, our company urgently purchased raw materials and get the welding team ready in advance. At this time, the steel pipe is in full production.

https://www.xysteelpipe.com/xinyue-fully-supports-singapore-mrt-project/

2022年8月30日星期二

What are the precautions for seamless steel pipe production?

Precautions for seamless tube production:

1. Pay attention to whether the thickness of the capillary wall is uniform. If it is found that the thickness of the capillary wall is uneven, the surface polishing treatment must be performed. In addition, whether the inside and outside of the capillary tube is flat and there are no bumps and defects. Once the bumps or defects are found, it should be done in time out processing.

2. For the re-inspection of the capillary, the main work of the re-inspection is to ensure that there are no cracks and defects on the outside of the capillary, check the problems existing in the capillary and make corresponding elimination measures, and be sure to remove the pitting and folding inside the capillary.

3. It is a requirement for the tool. Generally, the tool used for cold drawing has a higher surface finish. Only when the surface finish of the tool is high, the finish of the cold drawn steel pipe will be higher. In addition, the dimensional accuracy and hardness of the mold are also relatively high. Yes. Therefore, it is also very important for us to choose a good abrasive tool in the production, and the phenomenon that the abrasive tool sticks to the steel must not occur.

The production process of seamless steel tube includes the following steps: material preparation – tube blank heating and skew rolling piercing – capillary trimming – thermal expansion deformation sizing – heat treatment – straightening – internal grinding – rectification – External grinding – flaw detection – finishing, final inspection and packaging.

https://www.xysteelpipe.com/what-are-the-precautions-for-seamless-steel-pipe-production/

Xinyue FBE coated steel pipe project to ensure people’s livelihood drinking water in Australia

Project location:Australia

Product:ERW steel pipe and Seamless steel pipe

Standard and material:API 5L GR.B

Specifications:6”, 10”, 12”

Usage:Drinking water pipeline construction project

Inquiry time:2021-10-15

Order time:2021-11-03

Shipping time:2021-12-31

Arrival time:2022-02-06

I met this customer in October 2018. Customer regularly ordered steel pipes for inventory. This order is slightly different from the past. Our customer purchases FBE coated steel pipes with coating of meeting the food level for drinking water pipeline.

After nearly two months of production, the pipes was completed on schedule; Before transportation, the third party carefully inspected the coating, and the data obtained 100% met the customer’s order requirements. During shipment and loading, our company fixes the rope buckle on the surface of the steel pipe to achieve the purpose of protecting coating.

FBE coated steel pipe

FBE coating adopts special fusion bonded epoxy powder coating as film-forming material, which is a thermosetting coating. Before spraying, the steel pipe is derusted and preheated, and then the epoxy powder coating is sprayed on the surface of the steel pipe by electrostatic spraying. The coating is fused and bonded on the surface of the steel pipe to form a coating. The film thickness is 300 ~ 500 μ m. Super strong level can reach 800 μm above. FBE coating has the advantages of strong adhesion to steel, good film integrity, cathodic stripping resistance, soil stress resistance and wear resistance. It can be used as anti-corrosion coating for buried pipeline, underwater pipeline and outer wall of steel pile; It can also be used for anti-corrosion coating on the inner wall of pipelines transporting oil, natural gas, fresh water, seawater or sewage.

https://www.xysteelpipe.com/xinyue-fbe-coated-steel-pipe-project-to-ensure-peoples-livelihood-drinking-water-in-australia/

Xinyue helps the construction of fire safety in Africa

Project location:Africa

Product:Reducing Tee, Concentric Reducer

Specifications:

Reducing Tee 3”x 2”

Concentric Reducer 3”

Standard and material:ASTM A234 WPB

Usage:Pipe connector

Inquiry time:2022.02.15

Order time:2022.02.15

Shipping time:2022.02.30

Arrival time:2022.03.07

This time we want to introduce a regular customer in Africa. At the beginning of 2018, the customer chose Xinyue to cooperate for the first time, and ordered a batch of ERW steel pipe. The comprehensive and considerate service made the customer who feel the sincerity and intention of Xinyue. Of course, good service is only the first step. What really impresses customer is the high-quality products. All test data meet the requirements of the order, and have been well received by third parties and customer. With this good start of this order, no matter what steel products are needed, customer always consider Xinyue as the first supplier.In succession, They also cooperated with our company with pipe fittings,fire pipes with grooved for many times.

In fact, the service is reflected in all aspects. Due to the needs of the project, the customer needs our company to cooperate with the production of some urgent orders. The order this time is that the customer urgently needs a batch of pipe fittings: 2pcs each—Reducing Tee & Concentric Reducer, the products are used for the fire protection system of the building under construction. On the second day of the customer’s inquiry, Customer signed a contract with our company and paid 100% payment at once. Xinyue felt the “urgency” of the customer and immediately arranged the production of raw materials, and finally the customer received the payment within the expected time. The arrival of the goods ensures the smooth implementation of the projects under construction. Trust is generated from cooperation again and again. We are willing to be a solid backing for customers, so that customers can undertake various projects without worries, just like Xinyue’s good vision of “build the world and serve the global”!

Xinyue pipe fittings series products cover flanges, elbows, elbows, tees, reducer, clamps, couplings, etc. our goal is to realize the customer’s one-stop procurement platform. On this platform, customers can collect all kinds of steel products, so as to reduce time cost, improve profit space and win-win situation. Xinyue is definitely your best choice!

https://www.xysteelpipe.com/pipe-fitting-home-xinyue-helps-the-construction-of-fire-safety-in-africa/

Xinyue Steel Participated in Australia Government Metro Project

Project location:Australia

Product:Square tube and round tube

Standard and material:AS1163 C350

Specifications:round tube 1016*20mm

square tube 50mm*50mm*6- 400*400*16mm

Usage:Government Metro

Inquiry time:2021.06

Order time:2021.11

Shipping time:2022.02

Arrival time:2022.03

Depending on its rich experience on exporting projects, Tianjin Xinyue has won the trust of more and more customers. With the continuous rise of performance in recent years, Tianjin Xinyue has gradually gained its own place in the international steel pipe market. It is precisely because of its professional technology and rich experience that Tianjin Xinyue has attracted many new customers to cooperate with Xinyue.

In June 2021, we received an inquiry from a new customer in Australia. The customer reported that this batch of goods would be used for the construction of government subway projects. All suppliers must pass the pre-qualification first. Xinyue submitted the quotation and qualification certificates to the customer at the first time. Meanwhile, our company also shared similar project cases previously with customers and suggested to the customer that the product quality should be inspected by a third-party, so as to protect the rights and interests of customers. For Australian market, Xinyue has absolute confidence. Finally, through many rounds of communications and negotiations, Xinyue broke through the tight encirclement, was recognized by the project terminal. The terminal gladly accepted our product schedule. Finally Xinyue successfully signed this contract.

https://www.xysteelpipe.com/xinyue-steel-participated-in-australia-government-metro-project/