2022年12月29日星期四

Prime service win repeated orders from Middle East Customer

Tianjin Xinyue Iron and Steel Group focuses on export for more than ten years, the company has always adhered to the principle of "Integrity-based, Customer first, High quality, High efficiency", pursuing 100% customer satisfaction. From pre-sales, production, shipping and after-sales, Xinyue team treat each part sincerely, offer the best service, keep close communication with customers, regularly report the order situation, let customers know every detail of the contract in real time.

The order is aluminum sheet from regular customers in the Middle East, the customer is our old partner more than 4 years, This contract is the fourth aluminum plate renewal order this year, from the initial trial order of one container to the bulk order, customers are determined to choose Xinyue, with the customer's words is "even if the price from others is lower than ours, but he finally placed order to us, because of working with Xinyue more comfortable, more at ease." On the day of signing the contract, the customer quickly arranged the advance payment. Thank you very much for the trust of the customer. Xinyue never fails to live up to the expectation of the customer, and always returns to the customer with the best products and the best quality service.

At present, the production of goods is about to be completed, and the last batch of orders are under negotiation. We believe that customers will continue to choose Xinyue. In the future, we will continue to optimize our products and improve our services, looking forward to becoming more and more customers' partners.

https://www.tjxysteel.com/news/Prime-service-win-orders-from-Middle-East-Customer-2053.html

2022年12月12日星期一

Fire fighting pipeline from Xinyue Steel Group

Project location: Saudi Arabia

Product:SMLS STEEL PIPE WITH NPT, FBE COATING

Standard and steel grade:ASTM A106 GR B

Specification: 6” x SCH 40 x 6m

Usage:Fire fighting pipelines

At the end of October, Xinyue received an inquiry from UAE customer for Seamless fire pipe, requiring internal and external epoxy powder coating, NPT ends. At present, the goods have been produced and passed the third-party inspection, waiting for delivery.

Fire fighting pipelines normally supplied by Xinyue include:

Standard: ASTM A53 , ASTM A795,ASTM A135, BS1387, EN10255, ASTM A106, EN 10216-1

Dimension: 1/2” - 12”, Sch10/ Sch40 as ASME B36.10M, LIGHT , MEDIUM, HEAVY as BS/EN standard

Pipe End: Grooved end, Threaded end, Beveled end

Surface: Red painted, Hot dip galvanized, Black painted, Blue Painted

In addition to pipes, Xinyue can supply fire-fighting supporting pipe fittings, valves,clamps, etc.

Fire fighting products is to be with the priority of safety. Each batch of steel pipes supplied by Xinyue will be produced and tested in strict accordance with the standards. The testing scope includes chemical composition, tensile test, bending test, NDT, hydrostatic test, etc. At the same time, it can accept the supervision and inspection of any third party and customers to ensure the safety and reliability of the pipeline.

https://www.tjxysteel.com/news/Fire-fighting-pipeline-from-Xinyue-Steel-Group-2077.html

2022年12月11日星期日

ERW and Seamless steel pipe from Xinyue Steel to Australia

 This is an Australian customer. Since we met, we have successfully completed 10 orders, and the epidemic didn’t stop the pace of cooperation between the two sides. The customer is engaged in the equipment manufacturing industry and attaches great importance to product quality. In the process of order service, from the early cooperation until now, he has become a loyal customer of Xinyue. Because Xinyue has always put product quality first, we firmly believe that this is the cornerstone of enterprise development, and only by creating high-quality products can we be invincible.

Project location:Australia

Product:ERW Steel Pipe and Seamless Steel Pipe

Standard and material:API 5LGR.B

Specifications:4″, 8″, 12″

Application:Pressure Pipeline

Inquiry time:2022.07.06

Order time:2022.07.25

Shipping time:2022.09.03

Arrival time:2022.10.08

In July 2022, the customer placed the order to our company again. For this batch of steel pipes, the customer needs to process the internal threads later, so we need to control the inner diameter of the steel pipes. During the re-inspection of finished products, our quality inspectors recheck the inner diameters of steel pipes one by one to ensure that the inner diameters of each steel pipe meet the processing requirements. Before the shipment, the third-party testing company designated by the customer has carried out the final inspection of the goods, which is up to expectations. All the testing data meet the customer’s requirements. At present, all goods have been put into use and highly praised by customers!

In fact, for Australian customers, Xinyue has many years of successful experience and has already formed its own professional operation process. It will prepare some document templates, packaging statements, Chinese and Australian certificates of origin, etc. in advance for later use. Such a series of operations will help customers to enjoy relevant preferences in customs clearance at the port of destination and provide the best service for customers.

https://www.xysteelpipe.com/erw-and-seamless-steel-pipe-from-xinyue-steel-to-australia/

Common questions refers to resistance welding

 Resistance welding is a method of combining the workpieces and applying pressure through the electrodes, using the resistance heat generated by the current passing through the contact surface of the joint and the adjacent area for welding. Resistance welding is a method in which electric current flows through the contact surface of the workpiece and the resistance heating effect generated in the adjacent area to heat it to a molten or plastic state to form a metal bond. ERW steel pipe is a steel pipe rolled using the electric resistance welding process.

Common welding problems and causes of resistance welding

1. Splash

If the heating is too rapid, and the surrounding plastic ring has not yet formed or is not tight enough, the sharply heated contact point will rise extremely fast due to the temperature. The internal metal is vaporized, and under the action of the electrode pressure, the liquid metal in the ring will be pressed out, and then sprayed to the gap between the plates in the form of splash, which is called the reason for the internal splash:

1) The surface of weldments and electrodes is not clean and there is a lot of dirt;

2) Electrode pressure is too small

3) The weldment and the electrode are not in real contact

4) Iron particles stick to the surface of the electrode

5) The assembly gap is too large, and the two contact surfaces of the workpiece are uneven

6) The workpiece is not clean

7) The shape of the electrode contact surface is not correct

8) The preloading time is too short

9) Excessive current

10) The workpiece is placed unevenly and inclined during welding

11) Small margins.

After the minimum nugget is formed, continue to heat, and the nugget and plastic ring continue to expand outward. When the expansion speed of the nugget in the radial direction is greater than the expansion speed of the plastic ring, it will fly out. The reasons for this are:

1) The welding current is too large;

2) The welding time is too long.

It is caused by the strong electrode pressure breaking the plastic ring around the point core and causing the overflow of liquid metal.

2. Weak soldering

Causes:

1) The voltage is too low, and the magnetic material enters the secondary circuit of the welding machine;

2) The dot pitch is too small;

3) The current is small and the electrode pressure is large;

4) The diameter of the electrode end face is large;

5) Electrode surface wear and stacking;

6) The welding time is insufficient, and the welding specification is too strong.

3. Solder punch through

Causes:

1) The current is too large;

2) Insufficient electrode pressure;

3) The power-on time is too long;

4) Poor electrode cooling conditions;

5) The heating time is too fast

4. Solder joint indentation depth

Causes:

1) The power-on time is too long;

2) Insufficient electrode pressure;

3) The current is too large;

4) The solder joint is seriously overheated;

5) Severe spraying;

6) The original size of the welding and assembly room;

7) The electrode is too sharp (the diameter of the electrode end face is too small)

The electrode indentation depth on the surface of normal solder joints should not exceed 10%-20% of the plate thickness

https://www.xysteelpipe.com/common-questions-refers-to-resistance-welding/

2022年12月8日星期四

Xinyue Steel Support Bangladesh Steam & Condensate Line Project

The order project to be introduced today the project is used in Bangladesh, which is the first cooperation between Xinyue and customers.

The products mainly include seamless steel pipes, pipe fittings and thermal insulation layer.

Material:ASTM A106 GRADE B

Specification:168.3mm*7.11mm*6m, 114.3mm*6.02mm*6m

Specification:

Usage: Steam & Condensate Line

Timeline:

Received the inquire on 8th November,2021

Signed the contract on 18th November,2021

Delivery time in beginning of January,2022.

Estimated time of arrival in the early February,2022.

After receiving the inquiry, we communicated with the customer at the first time. After knowing the purpose, we provided relevant ITP &MPS technical documents and showed our rich experience in many famous projects, so as to obtain the customer's trust in the quality. Subsequently, in view of the special insulation needs of customers, we provided customers with relevant insulation qualification certificates. The comprehensive and professional service brought no worry to customers. It also laid a solid foundation for subsequent orders.At present, all of goods are expected to be shipped in early January 2022 and will be officially put into the project in March,2022.

It is really believed that the first success cooperation will help Xinyue further into Bangladesh market.

https://www.tjxysteel.com/news/Xinyue-Support-Bangladesh-Steam-Condensate-Project-2079.html

The order for the Middle East marine steel structure project was successfully delivered

Project location:Middle East

Product:T-Type Welding Pipe & SMLS Pipes

Standard and material:

EN10219 EN10225 S355G7/G8+N/MZ35

API 5L X52N PSL2

Specifications:

OD 273-1219MM

WT 12.7-75MM

L 6000-12000MM

Application:Offshore steel structure project

Inquiry time:2022.01.20

Order time:2022.05.31

Shipping time:2022.07.25

Arrival time:2022.08.30

This order is not easy for us and customer. The end user has strict requirements on the steel grade of the steel pipe, and the wall thickness is 20-75mm. Regular customer contacted Xinyue at the first time when they received the project. Many successful cooperation cases in the past make them feel that Xinyue is a very trustworthy partner. Whether resources or professionalism, Xinyue hand this project will give them incomparable confidence. we began to prepare the best scheme when we received the inquiry. However, due to repeated changes in the design, we were unable to confirm the order, but we updated the feasible scheme for the customer many times during the process to support.

Until the end of May, the end user confirmed the final design, customer signed a contract with Xinyue immediately. After the gap of four months to confirm the design, the previous inventory pipes had been sold out. In order to support the customer to complete the project as soon as possible,our company gathered support from multiple departments. The procurement department integrated all resources to find the suitable raw material steel plate for this production. The production department mobilized excellent technical workers to work overtime to put it into production, The document Department handled the freight forwarding procedures and shipping matters in time, while the quality inspection department strictly carried out every test step during the production process, First step carried out physical, chemical and impact tests on the raw steel plate (CNAS laboratory), and then tested the physical and chemical and impact properties of the finished steel pipe and 100% NDT test on the weld area of T-shaped welded pipe, to ensure the quality of all pipes. Through the cooperation of all departments, the delivery date was finally controlled within 40 days. At present, the products have been delivered and put into project production. Wish our customer a better business.

https://www.tjxysteel.com/news/Middle-East-marine-steel-structure-project-2080.html