2022年9月30日星期五

Xinyue elbow manufacturing service project for Nigerian government

Project Location:Nigeria

Products:Bend

Size: 10″

Standard:API PSL2 ANNEX J X65

Coating requirement:3LPP

Application:Offshore Pipeline

Inquiry Time: Dec, 2021

Purchase Time:May, 2022

This order is a regular client in Nigeria for the bend. Xinyue has rich experience in supplying bend. In the early stage, we provided the client with a number of bend production videos and shipment project records, which assured the quality assurance of the client.

After the order confirmed, ITP and MPS were provided, and technical, production and the technical parties held several meetings to communicate and confirm detailed technical details and drawings. To strictly control the production orders, from mother pipe detection to bend production of all kinds of testing, lamination UT test, the bend body and bend end UT testing, magnetic testing, dimension inspection report, the sand blasting test of the bend, salinity, roughness detection, the thickness of the corrosion protection and detection, the entire production schedule updated in real time to the client, let client more understanding and more assured to Xinyue. At present, the order will be finished and shipped to Nigeria.

https://www.xysteelpipe.com/xinyue-elbow-manufacturing-service-project-for-nigerian-government/

Xinyue successfully delivered orders for new customers in Africa

Project location:Kenya

Product:Seamless steel pipe & pipe fittings

Standard and material:API 5L GrB PSL1

Specifications:21.3-219mm*12000mm

Application:Pipeline construction

Inquiry time:2022.01.09

Order time:2022.02.13

Departure time:2022.07.05

Estimated arrival time:2022.09.15

The client is an African project group company. We met in 2020. During that time, xinyue has participated in 4-5 project bids from their company. After frequent communication with customers and video conferences, the customer’s trust and professional recognition of Xinyue has also increased. And finally began the first cooperation in 2022. The cooperative products are galvanized coated seamless pipes and fittings, with up to 200 items. Taking into account the possible collisions on the road, Xinyue has made great efforts in product packaging. All coated pipes are upgraded to tarpaulin packaging, and all pipe fittings are individually packaged in foam paper and in fumigation-free wooden boxes. At present, all products are ready and waiting for delivery, and we look forward to long-term cooperation with customers!

https://www.xysteelpipe.com/xinyue-successfully-delivered-orders-for-new-customers-in-africa/

Quality service is the winning formula for constant orders from regular customers

Project location:CHILE

Product:ERW STEEL PIPE

Standard and material:ASTM A53 GR A

Specifications:18”STD

Usage:Low liquid transmission pipeline

Inquiry time:2022.05.10

Order time:2022.08.05

Shipping time:2022.09.05

Estimated arrival time:2022.10.20

This order is a Chile regular client regular order every year. This client has long time cooperation relationship with Xinyue for many years. Xinyue providing superior quality, fast delivery time and excellent service so the client choose Xinyue all the time and reach the willing of long-term cooperation.

https://www.xysteelpipe.com/quality-service-is-the-winning-formula-for-constant-orders-from-regular-customers/

Surface treatment of spiral tubes

Spiral pipe derusting and anti-corrosion process:

Derusting is an important part of the anti-corrosion process of spiral welded pipe pipelines. At present, there are many derusting methods, such as manual derusting, sand blasting and pickling and so on. Among them, manual rust removal, mechanical rust removal and painting rust removal (anti-corrosion brushing oil) are relatively common rust removal methods. The following is a brief introduction to the specific operation requirements of these three rust removal processes by welded pipe manufacturers.

1) Manual rust removal

Use scrapers and files to remove the oxide skin and casting sand on the surface of the pipes, equipment and containers, and then use a wire brush to remove the rust on the surfaces of the spiral pipes, equipment and containers, then polish them with sandpaper, and then use cotton silk to remove them. Wipe clean.

2) Mechanical descaling

First remove the oxide skin and casting sand on the surface of the pipe with a scraper and a file; then one person is in front of the rust remover, and one person is behind the rust remover, and the pipe is placed in the rust remover repeatedly to remove rust until the metal color is exposed; brush Before oiling, wipe it again with cotton silk to remove the floating ash on its surface.

3) Anti-corrosion brush oil

Pipes, equipment and container valves are generally subjected to anti-corrosion and oil brushing according to the design requirements. When there are no design requirements, the following regulations shall be followed:

1. Exposed pipes, equipment and containers must be painted with an anti-rust paint first, and then painted with two top paints before handover. If there are requirements for thermal insulation and anti-condensation, two anti-rust paints should be painted;

2. Two coats of anti-rust paint should be applied to concealed pipelines, equipment and containers. The second coat of anti-rust paint must be painted after the first coat of paint is completely dry, and the consistency of the anti-rust paint should be appropriate;

3. When the buried pipeline is used as the anti-corrosion layer, if the construction is carried out in winter, it is advisable to use rubber solvent oil or aviation gasoline to dissolve 30 A or 30 ethyl petroleum asphalt. Two kinds:

① Manual brushing: Manual brushing should be applied in layers, each layer should be reciprocated, criss-crossed, and the coating should be kept uniform without missing or falling;

② Mechanical spraying: When spraying, the sprayed paint flow should be perpendicular to the spraying surface. When the spraying surface is flat, the distance between the nozzle and the spraying surface should be 250-350mm. If the spraying surface is an arc surface, the distance between the nozzle and the spraying surface should be about 400mm. , When spraying, the movement of the nozzle should be uniform, the speed should be maintained at 10 ~ 18m/min, and the compressed air pressure used for spray painting should be 0.2 ~ 0.4MPa.

https://www.xysteelpipe.com/surface-treatment-of-spiral-tubes/

2022年9月28日星期三

Xinyue Steel supply SSAW Steel pipe for piles in Philippines

Project location:Philippine

Product:SSAW pipe

Standard and material:ASTM A252 Q355B

Specifications:OD2024X12MM OD1824X 12MM

Usage:piling

Inquiry time:2022, 5.12

Order time: 2022 , 6.14

Shipping time:2022. 8.20

Estimated arrival time:2022.9.5

Since January 2018, Xinyue Steel Group has entered the list of suppliers of bridge construction projects in the Philippines, and has actively participated in the design of local bridges, from construction to steel pipe transportation, welding solutions, and continuously providing customers with high-quality services and successful delivery with more than 4,000 tons steel pipes. Xinyue’s successful completion of projects one after another has established a good image and reputation in the field of bridge construction in the Philippines.

This order is from a local contractor in the Philippines. In the middle of 2021, the customer purchased a small batch trial order of similar specifications from Xinyue. The customer gave a good evaluation of the last purchase experience and the quality of the steel pipe, and shared some photos from time to time for project construction site.

This purchase is a piling project for bridge construction. The customer has contracted an 8-kilometer road construction and needs to provide high-standard and high-quality pile pipes. Baosteel is specially designated as the raw material factory. The surface of the steel pipe is sand blasted SA2. 5 with black paint. Based on the previous good supply record, customers are very inclined to purchase from Xinyue.

After half a month’s accounting by engineers, the customer determines the final purchase quantity. At the beginning of June, we had an online conference with the customer to finalize the details of the order .

https://www.xysteelpipe.com/xinyue-steel-supply-ssaw-steel-pipe-for-piles-in-philippines/

Prime Quality products won many orders from Middle East customers

Project Location: UAE

Products: Aluminum sheet / coil

Width: 2000MM;1200M;

Standard: ALLOY 3003

Application: Hotel Construction

Inquiry time:9th Aug, 2022

Purchase time: 12nd Aug, 2022

Estimated Shipping time: 23rd Sep, 2022

Estimated Arrival time: 23rd Oct, 2022

On 9th Aug, 2022, Xinyue received an inquiry from the customer, saying that the hotel project under construction still needed some supplementary materials, the quantity was about one container, the size was 2000MM and 1650MM, and the delivery time was urgent. Xinyue submitted the best price and delivery plan to the customer on the same day. On the second day, the customer replied that our price was about 6% higher than that of the rival, and he asked us to give him a discount. After a short negotiation, Xinyue finally won the order again with a price slightly higher than that of the competitor on 12nd August. Many years of cooperation experience, as well as Xinyue excellent product quality and superior service, is the key to win the orders.

One week after receiving the advance payment, the customer suddenly informed us that due to the urgent need of materials for the project progress, the aluminum sheet with the size of 1650MM could only be purchased locally. He requested to cancel the size of 1650MM and order aluminum coils with other sizes instead.However, at that time, Xinyue has already ordered the raw material and arranged production, but considering the actual situation of the project, we agreed to the customer’s requirement after coordination. The customer is very grateful for our support and highly appreciate our deployment ability.

At present, all the goods have been completed and passed the inspection smoothly. It is expected to be shipped to the port this week and sail to Middle East, and it is expected to arrive at the destination port in late October. We look forward to cooperating with the customer again.

https://www.xysteelpipe.com/prime-quality-products-won-many-orders-from-middle-east-customers/

2022年9月27日星期二

The development direction of spiral welded pipe

Due to the increasing bearing pressure of the pipeline, the use conditions are becoming more and more severe, and the service life of the pipeline should be extended as much as possible. In order to improve competitiveness, carbon steel pipe manufacturers should research and innovate in what aspects, and what are the main development directions of spiral welded pipes?

(1) Production of large diameter thick-walled pipes to improve pressure resistance;

(2) Design and produce steel pipes with new structures, such as double-layer spiral welded pipes, that is, double-layer pipes are welded with strip steel with half the thickness of the pipe wall, which not only has higher strength than single-layer pipes of the same thickness, but also does not appear brittle failure;

(3) Develop new steel grades, improve the technical level of smelting technology, and widely use controlled rolling and post-rolling residual heat treatment technology to continuously improve the strength, toughness and welding performance of the pipe body;

(4) Vigorously develop coated pipes, such as coating the inner wall of the pipe with an anti-corrosion layer, which can not only prolong the service life, but also improve the smoothness of the inner wall, reduce fluid friction resistance, reduce wax accumulation and dirt, reduce pigging times, and reduce maintenance cost.

The spiral pipe plays a great role in conveying gas and transportation. With the planning and construction of a number of major pipeline projects at home and abroad, high value-added products such as large-deformation pipeline steel, high-strength hot-simmering elbows, and thick-specification low-temperature pipe fittings have shown good market competitiveness and large market demand. However, domestic enterprises are relatively slow in developing this series of products. They should develop high-value-added large-deformation pipeline steel, steel for hot simmering and bending, steel for low-temperature pipe fittings for pipeline stations, and X100 straight seam suitable for industrial applications as soon as possible. Submerged arc welded pipe, spiral seam submerged arc welded pipe and hot simmered spiral welded pipe.

https://www.xysteelpipe.com/the-development-direction-of-spiral-welded-pipe/

2022年9月26日星期一

Galvanized coil helps Middle East Hotel Construction

Project Location: UAE

Products: Galvanized coil

Specifications: 1500*1.35MM;1200*1.35M

Standard: ASTM A653 DX51D

Application: Hotel Construction

Inquiry time:10th June, 2022

Purchase time: 16th June, 2022

Estimated Shipping time: 30th July, 2022

Estimated Arrival time: 30th Aug, 2022

Today I would like to introduce to you a regular customer from UAE, who is a local trader and has two processing plants. The customer has been purchasing galvanized coils from Xinyue for four consecutive years since 2019 for a local hotel project, which are used together with the aluminum coils and aluminum plates that the customer has been purchasing from our company for the past two years.

The inquiry for this order was sent on 10 June, even the products are similar to the previous order, but we provided the price of thick at 1.35mm and 1.5mm for customer’s reference in the first time as per customer’s inquiry. The wall thickness control and delivery date are strictly in accordance with the customer’s requirements. After a short discussion, the two sides quickly reached an agreement due to the tacit understanding of cooperation for many years, the client chose to place the order with Xinyue even though our price was 3.6% higher than that of our competitor. We received the customer’s PO on June 16 and arranged the advance payment the next day. At present, all products are in production and are expected to be completed and shipped to the destination port by the end of July, so as to catch up with the customer’s delivery date and not delay the project.

https://www.xysteelpipe.com/galvanized-coil-helps-middle-east-hotel-construction/

Xinyue Always Insists On High Quality As The First Guide

Project location:India

Product:EFW Stainless steel pipe

Standard and material:ASTM A789 SS2205

Specifications:19×1.2x3000mm

Application:Heat Exchanger Manufacturing

Inquiry time:Jun, 2022

Order time:Sep, 2022

Shipping time:Oct, 2022

Estimated arrival time:Nov, 2022

The customer is a local machinery manufacturer from India, and it is the first time to cooperate with Xinyue. At the end of June, we received the first inquiry of seamless duplex stainless steel from the customer, we provided two options of sea and land transportation as per customer’s request.

At the end of August, the customer told us that they win the order from end-user, but due to the long delivery time of Xinyue, the customer planned to look for ex-stock in local. Xinyue did not give up. With a small diameter and thin wall thickness, we must ensure the quality of our products, not only delivery time.After repeatedly communicating with the customer, the customer finally accepted to use the welded pipe process to produce the order, which reduced the delivery time to 45 days and saved the cost.

https://www.xysteelpipe.com/xinyue-always-insists-on-high-quality-as-the-first-guide/

2022年9月1日星期四

Dn700 Psl2 x65qs Bends Shipped Successfully

Project location:Malaysia

Product:SMLS API 5L X65 PSL2 NACE MR-0175 90/45 DEGREES 5D BENDS

Standard and material:API 5L PSL2 X65QS, ISO 15590-1

Specifications:SMLS API 5L X65 PSL2 NACE MR-0175 90/45 DEGREES

Size: 711.2*23.83MM, TANGENT : 1050MM

Inquiry time: 20220602

Order time:20220621

Shipping time:20220820

Estimated arrival time:Sep 2022

At the beginning of June 2022, Tianjin Xinyue received an inquiry from an old customer in Malaysia, it’s pipe bend 5D SMLS API 5L X65 PSL2 NACE mr-0175 90 / 45 degrees source service, size: OD 711.2mm * 23.83mm, standard: ISO 15590.

This order will be officially produced at the end of July after the customer has reviewed the ITP, MPs, heat treatment, hydrostatic inspection, metallographic inspection, penetrate inspection, ball passing inspection and other procedure documents All products have been subject to 100% tempering heat treatment, intermediate frequency bend, physical and chemical (metallographic) inspection and hydraulic inspection as required by the customer. Since August 5, all products have been subject to penetration inspection, ball passing inspection, appearance inspection, dimensional inspection, packaging and spray mark inspection by the third party SGS. After successfully passing all inspections by the third party, all products were packed in the factory on August 11.

https://www.xysteelpipe.com/dn700-psl2-x65qs-bends-shipped-successfully/

Xinyue Steel Pipe Sells Well in Central Asia

Project Location: Kazakhstan

Products: Seamless steel pipe

Standard & Material: GOST 8732-78 Ct20

Specification:159x10x12000MM/ 273x12x12000MM/108x6x12000MM

Application:Gas Transportation

Inquiry time:2022.7.9

Order time:2022.7.11

Shipping time:2022.8.15

Estimated arrival time:2022.9.15

Few years ago, Xinyue cooperated with a group company in Kazakhstan for the first time by virtue of the advantages of payment methods. The company has 6 branches in Kazakhstan. They also have an office in Uzbekistan. Its business involves steel pipe processing, anti-corrosion processing, Stock pipe, bidding, construction and other fields. Due to the distance and production capacity advantages of the Russian market, there has been no new cooperation since 2 orders in few years ago. After then,During these years customers occasionally sent inquiries to Xinyue. The purpose is to compare the prices with other countries. In the absence of order support, many domestic suppliers are not willing to keep quote for the customer. Xinyue has always insisted on giving customers the most advantageous propoals, and Xinyue’s sincerity and service have always been valued by customers. In 2022, when customers are ready to expand Chinese market, Xinyue has become the first reliable supplier recommended by customers and within the group.

Until August this year, Xinyue has successively shipped seamless pipes and galvanized welded pipes of different sizes to customers. The shipping method involves rail, road. Choose the appropriate shipping method according to the real needs of customers. Xinyue actively applies for GOST certification for various types of steel pipes to better support customers.

One minute’s brilliant performance on the stage is attributed to ten years’ practice under the stage. Xinyue has been worked hard on international market for more than ten years. I believe that the time when we on stage in various markets will be perfect. Thanks to every partner who chooses Xinyue, from price, from quality, and finally to service. May all the cooperative relations be smooth and steady.

https://www.xysteelpipe.com/xinyue-steel-pipe-sells-well-in-central-asia/

Hot extrusion technology of seamless steel tube

The hot extrusion process of seamless steel pipe is a pressure forming method, which is to place the tube blank in a pressure-resistant container, and apply external force to cause the tube blank to plastically deform under the state of three-dimensional compressive stress. During extrusion, the tube blank is in a state of three-way compressive stress, so it can obtain a larger plastic deformation than rolling and forging. Depending on the material and extrusion method, the extrusion elongation coefficient can reach 5~500, or even higher. Because the extruded seamless steel pipe has the characteristics of high dimensional accuracy, dense metal structure and stable mechanical properties, hot-extruded seamless steel pipe is widely used in nuclear power, thermal power, petrochemical, aviation, aerospace, transportation and other fields .

Hot extrusion process

Billet preparation → annular furnace preheating → vertical induction furnace heating → glass powder lubrication → vertical press punching (expanding) → phosphorus removal → vertical induction furnace reheating → glass powder lubrication → extrusion → cutting and pressing → cooling

When using hot extrusion technology to produce seamless steel pipes, the broken pipes must be hollow billets. One is a hollow billet for perforating a forged or cast billet, and the other is a hollow billet for centrifugal casting. There are 3 different piercing methods for perforating forging or casting billets according to their steel grades and specifications:

①The solid tube blank is perforated on the vertical perforator;

② Drill a small hole (also called a pilot hole) in the center of the broken pipe in advance, and perform perforation on a pressure perforator;

③ Drill a large hole with a diameter slightly larger than the extrusion core rod in the center of the broken pipe, and send it directly to the extruder for extrusion.

During extrusion, the glass mat between the tube and the extrusion die melts and acts as a lubricant. The outer diameter of the extruded seamless steel pipe depends on the inner diameter of the die hole, and the gap between the mandrel and the die hole determines the thickness of the steel pipe. After the extrusion is completed, the steel pipe is cooled and collected, and subjected to heat treatment and hardcover treatment

https://www.xysteelpipe.com/hot-extrusion-technology-of-seamless-steel-tube/